Alpine Energy
Key disclosure figures, reliability trends and investment for this electricity network.
All electricity networksSwitch to another network
Network details
- Island
- South Island
- Ownership
- Council and trust
- Price-quality regulation
- Regulated
- Website
- Visit the network website
Source: Distributor details
Key facts
- Average connection points
- 34,057Rank 15 out of 29 · 2026
- Total circuit length for supply (km)
- 4,421Rank 13 out of 29 · 2026
- Maximum coincident system demand (MW)
- 146.2Rank 12 out of 29 · 2026
Source: Yearly electricity disclosures
Average time without power (SAIDI)
Loading chart…
Gaps indicate missing data.
View as table
The national line is weighted by connection points where both figures were reported.
Source: Yearly electricity disclosures
Average number of interruptions (SAIFI)
Loading chart…
Gaps indicate missing data.
View as table
The national line is weighted by connection points where both figures were reported.
Source: Yearly electricity disclosures
Capital and operating expenditure
Loading chart…
View as table
Source: Yearly electricity disclosures
Solar uptake
- Connections with solar
- 1,353
- Installed solar capacity (kW)
- 9,591.4
- Solar capacity per network connection (kW per ICP)
- 0.28
Connections with solar
Loading chart…
View as table
Installed solar capacity
Loading chart…
View as table
Sources: Regional solar installations snapshot · Monthly solar history · Yearly electricity disclosures. Snapshot published 24 November 2026. Monthly series archived 23 November 2026.
Zone substations
Each reported name appears once. Voltage entries are shown as supplied in the release.
View 42 reported names
Source: Zone substation disclosures
Recent disclosed interruptions
Historical records from Schedule 10a, shown in the local time reported by the distributor.
| Started | Feeder | Classification | Cause | Year ended 31 March |
|---|---|---|---|---|
| Temuka 02 - Milford | Planned | Planned interruption | 2026 | |
| Rangitata 13 - Rangitata Island | Unplanned | Human error | 2026 | |
| Temuka 07 - Rangitata | Unplanned | Defective equipment | 2026 | |
| Fairlie F380 - Fairlie Rural | Unplanned | Unknown | 2026 | |
| Studholme 01 - Otaio | Unplanned | Defective equipment | 2026 | |
| Geraldine G156 - Woodbury | Planned | Planned interruption | 2026 | |
| Timaru 2832 - Grants Road | Planned | Planned interruption | 2026 | |
| Timaru 2852 - Hadlow | Planned | Planned interruption | 2026 | |
| Pleasant Point CB1 - Waitawa | Unplanned | Defective equipment | 2026 | |
| Geraldine G156 - Woodbury | Planned | Planned interruption | 2026 |
Worst-performing feeders
Year ended 31 March 2026. Ranks are as reported for each network or subnetwork.
Unplanned SAIDI
Unplanned SAIFI
Customer impact ratio
Planned analytics
Network forecasts
See projections for reliability, investment and demand with uncertainty ranges.
View pricing preview for Network forecastsPlanned versus actual spending
Compare what a network expected to spend in its asset management plan with what it later reported.
View pricing preview for Planned versus actual spendingOutage causes
See how reported interruption frequency and duration vary by cause.
View pricing preview for Outage causes