Data sources and methods

Sources for network disclosures, historical interruptions, solar installations and national electricity figures.

Commerce Commission electricity distributor disclosuresCommerce Commission copyright policy

Crown copyright under CC BY 4.0 unless otherwise stated. Disclosure years end on 31 March. Money values are in nominal New Zealand dollars.

Data refresh

Last successful refresh
Latest attempt

success

Datasets

Metric coverage

Coverage of disclosure metrics
MetricYears coveredYears with dataNetworks in latest year
Planned SAIDI (A, B, H)2013–20261420
Unplanned SAIDI (C, D, E, F, G)2013–20261420
Total SAIDI2008–20261929
Planned SAIFI (A, B, H)2013–20261420
Unplanned SAIFI (C, D, E, F, G)2013–20261420
Total SAIFI2008–20261929
Average duration of a customer interruption (CAIDI)2008–20261929
Total interruptions2008–20261929
Total capital expenditure (net of contributions)2013–20261429
Total operating expenditure2013–20261429
Average connection points2013–20261429
Total circuit length for supply2008–20261929
Average connection point density2013–20261429
Total energy delivered to connection points2008–20261929
Maximum coincident system demand2013–20261429
Closing regulatory asset base2013–20261429
Total regulatory income2008–20261929

Metric definitions

ICP means installation control point, or electricity connection point.

Commerce Commission disclosure definitions and templates

Planned SAIDI (A, B, H) (minutes per ICP)
Sum planned interruptions initiated by Transpower (A), on the network (B), and caused by another distributor (H).
SCHEDULE 10: REPORT ON NETWORK RELIABILITY (10(i): Interruptions)
Unplanned SAIDI (C, D, E, F, G) (minutes per ICP)
Sum unplanned interruptions on the network (C), by Transpower (D), from the distributor’s generation (E), from other generation (F), and by another distributor (G).
SCHEDULE 10: REPORT ON NETWORK RELIABILITY (10(i): Interruptions)
Total SAIDI (minutes per ICP)
Use the disclosed total across interruption classes.
SCHEDULE 10: REPORT ON NETWORK RELIABILITY (10(i): Interruptions) · MP3: Price & Quality Measures
Planned SAIFI (A, B, H) (interruptions per ICP)
Sum planned interruptions initiated by Transpower (A), on the network (B), and caused by another distributor (H).
SCHEDULE 10: REPORT ON NETWORK RELIABILITY (10(i): Interruptions)
Unplanned SAIFI (C, D, E, F, G) (interruptions per ICP)
Sum unplanned interruptions on the network (C), by Transpower (D), from the distributor’s generation (E), from other generation (F), and by another distributor (G).
SCHEDULE 10: REPORT ON NETWORK RELIABILITY (10(i): Interruptions)
Total SAIFI (interruptions per ICP)
Use the disclosed total across interruption classes.
SCHEDULE 10: REPORT ON NETWORK RELIABILITY (10(i): Interruptions) · MP3: Price & Quality Measures
Average duration of a customer interruption (CAIDI) (minutes per customer interruption)
Divide total SAIDI (minutes per ICP) by total SAIFI (interruptions per ICP) where frequency is positive.
SCHEDULE 10: REPORT ON NETWORK RELIABILITY (10(i): Interruptions) · MP3: Price & Quality Measures
Total interruptions (interruptions)
Use the disclosed event count across all interruption classes.
SCHEDULE 10: REPORT ON NETWORK RELIABILITY (10(i): Interruptions) · MP3: Price & Quality Measures
Total capital expenditure (net of contributions) (NZ$ (nominal))
Use the Schedule 6a(i) capital expenditure total after capital contributions have been deducted. Convert thousands of dollars to dollars.
SCHEDULE 6a: REPORT ON CAPITAL EXPENDITURE FOR THE DISCLOSURE YEAR (6a(i): Expenditure on Assets)
Total operating expenditure (NZ$ (nominal))
Use the disclosed whole-network actual total and multiply the reported thousand dollars by 1,000.
SCHEDULE 6b: REPORT ON OPERATIONAL EXPENDITURE FOR THE DISCLOSURE YEAR (6b(i): Operational Expenditure)
Average connection points (ICPs)
Multiply disclosed average connection point density by total circuit length for supply.
SCHEDULE 1: ANALYTICAL RATIOS (1(iii): Service intensity measures) · SCHEDULE 9c: REPORT ON OVERHEAD LINES AND UNDERGROUND CABLES (9c: Overhead Lines and Underground Cables)
Total circuit length for supply (km)
Use the reported total overhead and underground circuit length for supply.
SCHEDULE 9c: REPORT ON OVERHEAD LINES AND UNDERGROUND CABLES (9c: Overhead Lines and Underground Cables) · MP1: Network Information (Network Information)
Average connection point density (ICPs/km)
Use the disclosed average number of ICPs per kilometre of circuit for supply.
SCHEDULE 1: ANALYTICAL RATIOS (1(iii): Service intensity measures)
Total energy delivered to connection points (GWh)
Use the disclosed electricity volume delivered to customer connection points.
SCHEDULE 9e: REPORT ON NETWORK DEMAND (9e(ii): System Demand) · MP1: Network Information (Network Information)
Maximum coincident system demand (MW)
Use the disclosed maximum coincident demand across the system.
SCHEDULE 9e: REPORT ON NETWORK DEMAND (9e(ii): System Demand)
Closing regulatory asset base (NZ$ (nominal))
Use the closing RAB for the disclosure year and convert thousands of dollars to dollars.
SCHEDULE 4: REPORT ON VALUE OF THE REGULATORY ASSET BASE (ROLLED FORWARD) (4(i): Regulatory Asset Base Value (Rolled Forward))
Total regulatory income (NZ$ (nominal))
Use the reported total regulatory income and convert thousands of dollars to dollars.
SCHEDULE 3: REPORT ON REGULATORY PROFIT (3(i): Regulatory Profit) · FS1: Regulatory Profit Statement (Regulatory Profit)